Tantárgyak / Comprehensive design 2

Alapadatok
Tantárgykód: BMEEPIPT911, BMEEPIPM2KX
Előtanulmányok: BMEEPxxT811, BMEEPEKA701, BMEEPEGA601, BMEEPIPM1KX
Követelmények: Project submission. Due to the current dean’s circular 1 personal consultation plus 1 online (single or team) consultation possibility is offered. The design diary must be continuously diarized about the design process. The course being based on consultation, continuous, real consultation is recommended throughout the semester!
Kredit: 10
Heti óraszám: 10 hours practice
Tárgyfelelős: Bartók István DLA
Oktatók: Bartók István DLA
Nagy Iván DLA
Szabó Dávid DLA
Szécsi Zoltán DLA
Vasáros Zsolt DLA
Árva József DLA
Tárgyleírás:
Information

for elaboration of the project


Character of the project

Comprehensive design is a two semester course. The task of the first semester – Comprehensive design I – is the elaboration of the projects program design, Comprehensive design II is for the detailed elaboration of the design.

During this one has to acquire the method to develop concept to technical solution. This phase of architectural design is a primary condition of feasibility of any building. A perfect concept can only become a successful work through the careful, technically correct, aesthetic forming and elaboration of the details. Forming details requires high degree of professional knowledge, advanced aesthetical sense, holistic creative skills and realistic economic approach. To acquire the methods of this complicated activity only on basic level intensive utilization of the study period is necessary. The project has to be improved on the base of critics on the Comprehensive design I of the departments. The projects can be improved in terms of architecture as well with the possible presenting of the original concept.

Work process

First the preliminary designs should be completed due to the given schedule (scale m=1:100, m=1:50) from every part of the design. The plans should be presented within the terms due to time schedule. This will be followed by the elaboration of details, finalization of constructions. The elaboration of the final project can be fulfilled using the details and the result of consultation with the associate departments. Certain to be solved tasks will be pointed out and evaluated by the consulting associate departments.  

Evaluation

In the mark of the final project architecture counts 40%, whereas the associate departments 15-15% each. Any part of the project is fail, the mark of the whole project is fail too. The final mark is given from the final project and the results of the comprehensive tests – due to the faculty’s regulation.

Deadlines

The project submission is due to the faculty’s regulation and enclosed timetable. To the successful fulfilment the certain parts of the project must be handed in, or presented.

Content of the plans

The plans should be filled with a maximum of technical content based on the solution of the details. We mainly expect the elaboration of more complicated parts of the building, with the solution of development and building together of bearing structures, of façade details and situating constructions of building services determining the architectural look.

 

Parts of the project to submit

 

  1. Site plan m=1:500. New site plan is only necessary in case of bigger change, wrong or  imperfect plan.

 

  1. Plans of each different level m=1:50

with representation the close surroundings, the main and particular dimensions, grid, the measures of each room, doors with opening direction, windows with subdivisions, marking the functional necessary installation, the names, measures and finishes of the rooms. In case of a greater establishment - checked by the consultant - the elaboration of a certain part of the building is enough.

 

3.      Sections m=1:50

The number of sections to submit depends on the variety of constructions and the complexity of the building. The solutions of constructions of each main volume of the building should be shown. Also in case of a block-like building, or unified construction at least 2 sections perpendicular to each other are necessary, (without the repetitive constructions)

with representation the typical height measures and the plan measures of the axis, the level heights, the names of the structures and materials, the order of layers

 

4.      All elevations m=1:50

with representation of structures (different levels signed with short dashed lines), the typical height measures, materials, colours. In case of a greater establishment - checked by the consultant - the elaboration of a certain part of the building is enough.

 

5.      Interior plan m= 1:20, 1:10, 1:5

The solution of a characteristic, architecturally demanding room (eg. foyer), construction details

floor plan, cladding plan of the internal walls, built-in furniture, equipments, plan of suspended ceiling with light and ventilation elements

Perspective views of the interior.

 

6.      Architectural description, showing the context of architectural and construction solutions. It should contain data not seen on the plan, demanded explanations for construction, working principles of structures, motivation of material and structure choices.

 

7.      Parts of design and descriptions of structures, building constructions, building services, construction technology due to requirements of each associate department.

 

8.      Other parts of design. Beyond these parts of design consultants may ask for solution of special details – depending on the character of the task.

 

9.      The plans of Comprehensive design I are to submit in a separate folder.

 


Comprehensive test

For practice design skills and architectural, logical way of thinking there is one compulsory design test during the semester. As all necessary information will be given for completing the tests, so there is no need for previous preparation. The mark of the test influences the final mark of the course (mark of the final project/ mark of the test = 85%/15%).

 

 

Other regulations, obtaining the final mark and the signature:

A./        Formal requirements: All drawings can be traditional hand- or CAD drawings or any other optional official scaled printed technique. The clear and correct technical presentation detailed due to the scale is important. The mid-term and final plans the can be handed in at biggest 60x80 cm, or folded to that size, or can be accepted as a documentation folded on A4 size. The dimensions are bound for storing and exhibition reasons. Smaller size can be used as well, but the use of different size plans destroys the level of the documentation. A stable cover due to the plans dimensions with index is necessary. The elaboration of the plans should be discussed with the consultant.

B./        By the deadline due to the timetable the final project must be handed in – irrespectively of its readiness.

C./        One test with at least a pass mark. The test is obligatory.

D./        The project submission is due to the faculty’s regulation and enclosed timetable. In the mark of the final project architecture counts 40%, whereas the associate departments 15-15% each. Any part of the project is fail, the mark of the whole project is fail too. The final mark is given from the weighted average of the final project and the results of the mid-term presentations.

 

2nd September 2021.

 

Prof Vasáros zsolt DLA                                     Bartók István DLA

university professor                                           associate professor

head of department                                           head of course

 

Letöltések:
Ütemterv:
1.6th September 2021, Monday 9:15-14:00 K 397 Representation of the semester’s working process 
9th September 2021, Thursday 8:15-13:00 K 397 Elaboration of working drawings, consultation 
2.13th September 2021, Monday 9:15-14:00 K 397 Elaboration of working drawings, consultation 
16th September 2021, Thursday 8:15-13:00 K 397 Elaboration of working drawings, consultation 
3.20th September 2021, Monday 9:15-14:00 K 397 Elaboration of working drawings, consultation 
23rd September 2021, Thursday 8:15-13:00 K 397 Announcement of test, Elaboration of working drawings, consultation 
4.27th September 2021, Monday 9:15-14:00 K 397 Submission and presentation of test 
30th September 2021, Thursday 8:15-13:00 K 397 Elaboration of working drawings, consultation 
5.4th October 2021, Monday 9:15-14:00 K 397 Presentation of working drawings, consultation 
7th October 2021, Thursday 8:15-13:00 K 397 Presentation of working drawings, consultation 
6.11th October 2021, Monday 9:15-14:00 K 397 Elaboration of detail plans, consultation 
14th October 2021, Thursday 8:15-13:00 K 397 Elaboration of detail plans, consultation 
7.18th October 2021, Monday  Preliminary studio week 
21st October 2020, Thursday  Preliminary studio week 
8.25th October 2021, Monday 9:15-14:00 K 397 Elaboration of detail plans, consultation 
28th October 2021, Thursday 8:15-13:00 K 397 Elaboration of detail plans, consultation 
9.1st November 2021, Monday  All saints 
4th November 2021, Thursday 8:15-13:00 K 397 Elaboration of detail plans, consultation 
10.8th November 2021, Monday 9:15-14:00 K 397 Elaboration of final design, consultation 
11th November 2021, Thursday 8:15-13:00 K 397 Students' scientific conference 
11.15th November 2021, Monday 9:15-14:00 K 397 Elaboration of final design, consultation 
18th November 2021, Thursday 8:15-13:00 K 397 Elaboration of final design, consultation 
12.22nd November 2021, Monday 9:15-14:00 K 397 Elaboration of final design, consultation 
25th November 2021, Thursday 8:15-13:00 K 397 Announcement of additional test 
13.29th November 2021, Monday 9:15-14:00 K 397 Submission/presentation of additional test 
2nd December 2021, Thursday 8:15-13:00 K 397 Elaboration of final design 
14.6th December 2021, Monday 8:15-14:00 K 397 Project finalization week 
10th December 2021, Friday 23:59 K 397 Project submission 23:59 Friday 10th December 2021 
15. K. 251  
17th December 2021. Friday 23:59 K. 251 Delayed submission 23:59 Friday 17th December 2021 (with late fee!) 
Hírek
2018. 11. 26. 10:11
Dear Comprehensive Students,
see the results of the comprehensive test - Bath in Mikháza enclosed. Improvement possibility is during the "replacement week" on 6th December 2018. We ask for an e-mail until 3rd December 2018 if one wnats to use this improvement possibility. According to the decision of the Faculty Council of 30rd May 2018 the comprehensive test counts 15% of the final mark.
Csatolt fájlok:
2018_2019_1_KX_comp_test_2.pdf (17 kB)
2015. 11. 27. 09:43
3 rd Comprehensive Test - Questions - Answers

There were two questions altogether, the answers:

1. From the required 10 parking places 1 must be accessible for the disabled.
2. The file “Képkivágás.jpeg” shows the design site. There is no border of the site, no regulation, the siting of building(s) is defined by “soberness” and by architecturally based decisions.
2015. 11. 22. 12:15
Results of the 2nd Comprehensive test

Dear Comprehensive Students,

you can find enclosed the results of the 2nd Comprehensive test. The submitted panels and models can be seen in the library of the department as well. Thursday 26th November 9.00 am there is going to be an evaluation of the 1st test in room K 210. For this and for the popularization of the projects we ask ALL STUDENTS to send the submitted panels in digital form to komplex.ipar@gmail.com latest by evening of 24th November.
At the same time there is going to be the announcement and start of the 1st additional test. The submission is the following morning in the department.
Authors of test marked 4 and 5 get a modest present on Thursday.
Csatolt fájlok:
kx_osszesitett_1_2_zh_.pdf (23 kB)
2015. 11. 06. 18:05
Enclosed the answers for the questions of 2nd test.
Csatolt fájlok:
2nd test questions_answers_.pdf (66 kB)
2015. 11. 04. 11:37
Dear Comprehensive Students!

Thursday 5th November 10.00-10.30 am there will be the start of the 2nd test in room K 210. Submission will be on Monday 9th November 09.00 am in the Departmental Library room.